Design and build two story deep basement using a top down sequence as to avoid damage to the surrounding buildings. Water proof concrete throughout including a new connection to the main sewer by tunnelling a heading out under the adjacent public road. KEA also completed the new extension to the rear of the existing building to overlap the completion of the basement works.